Taloombi Street Boathouse
This project's scope was to create a weekender for family and guests while keeping the heritage aspect of the existing boatshed and create a large entertaining area with an attached ensuite.
Water Street - Jetty rebuild
This project's scope was to rebuild the jetty and make it safe and practical.
Here, we have removed all decking along with the subframe while encasing the existing piers with HDPE to give the jetty a modern and clean aspect.
Irwine Road- Gangway and Pontoon Rebuild
This project's scope was to replace the gangway and pontoon due to storm damage.
N.G.D. Waterworks undertook the salvage of the pontoon and ramp while supplying the clients with a temporary pontoon to minimise disruption of their waterfront.
Hospital Bay - Jetty Rebuild
This project's scope was to reinstate the existing jetty with a modern, low-maintenance option.
As seen in the pictures, the existing piers were encased in HDPE to save cost while achieving a more modern and clean look.
Our client’s brief was to make this jetty have a ‘WOW Factor’; as you can see with the lighting option, this jetty is a standout asset to our client’s property.
Grays Point - Slipway Reconstruction
This Boatshed in Grays Point had existing rails that had been decommissioned; our brief was to bring the rails back to a safe standard and ensure our client's trouble-free boating.
We gave our client a full package completing the slipway, Supply and installation of a new Galvanised cradle and winch.
Flood Relief Works
During the 2022 floods in Wisemans Ferry, N.G.D Waterworks was contracted to assist with delivering Hay to stranded livestock over several weeks.
Gymea Bay - Pontoon and Jetty works
This project’s scope was to supply and install a new custom-made pontoon.
Raise the existing jetty 400mm.
Encase existing piles.
Instal a Davit with cradle.
Supply and install a Jetski dock.
Gymea Bay - Boatshed Rebuild
This boatshed was damaged from a gumtree falling on it during. a storm
The scope was to rebuild the boatshed making a more useable and practical area for a day by the water and entertaining.
We completed this whole project from start to finish keeping all the required works in house..
Vessel Fire Assistance
N.G.D. Waterworks were assisting the NSW Fire brigade with crew transfers.
Beach Remediation
N.G.D Waterworks was contracted to undertake waste removal from a local beach and remove it to a local waste facility via barge.
Yowie Bay- Skid Ramp
This project’s scope was to design and construct a timber skid ramp to allow our client to enter and exit the water with ease while still being able to launch and retrieve a jet ski or boat.
Various Pontoons
Built and constructed by N.G.D Waterworks